Lift and Flip Reacto
50L Explosion Proof Reactor with Lifting Device

Name:50L Explosion Proof Reactor with Lifting Device

Details
1. Explosion-proof high-pressure reactor should be used at designated locations and operated in accordance with the instructions. The test pressure, service pressure and high service temperature inscribed on the main vessel should be used within the allowable range.
2. Explosion-proof high-pressure reactor belongs to precise equipment. The sealing ring adopts the form of conical contact sealing, and the main bolts are tightened so that they can press each other tightly to achieve the purpose of sealing. Special care must be taken of the sealing cone surface to avoid any collision and damage.
3. When installing the cap, first place the reactor body well, then place the cap carefully on the reactor body according to the fixed position. When tightening the main bolt, it must tighten gradually according to the diagonal and symmetrical multiple times. The force should be uniform, and the cap should not be inclined to one side to achieve good sealing effect, and the tightening moment should not exceed the prescribed tightening moment. To prevent the sealing surface from being crushed or worn out.
4. The pressure used by the pressure gauge should be better used within 1/2 of its marked pressure. The pressure gauge is often compared with the standard pressure gauge and corrected.
5. Oxygen pressure gauge should avoid mixing with other gas pressure gauges.
6. Safety valves and other safety devices shall be equipped with instruments that have been regularly checked to meet the required requirements.
7. Attention must be paid to the accurate insertion of the thermometer into the reaction solution.
8. Keep the inside and lining parts of the autoclave clean.
9. When the plate flange cover is covered, the bolts located on the diagonal line should be tightened in the same order as the pairs.
10. When the measuring instrument breaks down, the front and back sides of its glass face are broken in most cases. Therefore, do not stand in these dangerous places when operating. When danger is expected, the glass should be removed and replaced.
Lifting Reactor, Pilot Reactor, High Pressure Reactor, Polyreactor, Hydrogenation Reactor